{"id":177703,"date":"2017-11-09T17:23:55","date_gmt":"2017-11-09T16:23:55","guid":{"rendered":"https:\/\/idec-grandsud.com\/idec-ingenierie\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/"},"modified":"2022-08-22T03:53:24","modified_gmt":"2022-08-22T01:53:24","slug":"idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine","status":"publish","type":"post","link":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/","title":{"rendered":"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine)"},"content":{"rendered":"<h2><strong>IDEC invited its client, French supermarket giant, INTERMARCHE, local councillors and partners, who have been working on the site, as well as their own staff to a traditional French leg of lamb ceremony at the warehouse being built at Grand Fougeray (Ille-et-Vilaine). This friendly get together included 160 people.<\/strong><\/h2>\n<p>IDEC, leader in the design and construction of logistics platforms and all sorts of commercial buildings is currently building a warehouse in Grand Fougeray for INTERMARCHE. This warehouse aims to supply all of the stores in the brand throughout Western France and will be replacing its current site. After ten months of work, IDEC invited the various partners to a lunch at the work site. \u201c<em>We are sticking with the traditional leg of lamb cooked in a bath of molten bitumen at our work sites<\/em>,\u201d explained Tony MORAIS, General Director of IDEC. \u201c<em>It\u2019s an opportunity to bring together all those involved in the project with the builders and our client<\/em>.\u201d<\/p>\n<h3>11 months of work<\/h3>\n<p>The IDEC work teams began work on this 53,000 m\u00b2 project last January at an 18 hectare site. This dry warehouse includes 7 units each measuring 6000 m\u00b2 and three special units designed to store inflammable products each measuring 3000m\u00b2. 65 loading bays will allow the users to make the most of these facilities. A 13,000m\u00b2 pallet area has also been set up outside, which will make it the biggest for INTERMARCHE. 1800 m\u00b2 of offices have been built on the second floor to house the administrative work.<\/p>\n<h3>A construction certified \u2018exceptional environmental standard\u2019<\/h3>\n<p>The construction phase was planned to ensure sustainable development with responsible management procedures including all the different environmental, social and and economic aspects. The IDEC teams were of course aiming for exceptional environmental standard certification. This comes in addition to such certified projects that have already been developed over a surface of more than a million m\u00b2.<\/p>\n<h3>A second flagship project for INTERMARCHE<\/h3>\n<p>With this latest logistics platform for INTERMARCHE, IDEC has built a second major project for the French retailer. This latest project comes after the 60,500 m\u00b2 warehouse handed over in late 2016 in Bourges, which also was certified to be of an exceptional environmental standard.<\/p>\n<p>Find out more <a href=\"http:\/\/www.idec-ingenierie.com\/en\/realisations\/\"><strong>achivements<\/strong><\/a>. Please\u00a0<a href=\"http:\/\/www.idec-ingenierie.com\/en\/contact-us\/\"><strong>contact us<\/strong><\/a>\u00a0if you require any more information or if you wish to discuss a new project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>IDEC invited its client, French supermarket giant, INTERMARCHE, local councillors and partners, who have been working on the site, as well as their own staff to a traditional French leg&hellip;<\/p>\n","protected":false},"author":1,"featured_media":177301,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[55],"tags":[],"class_list":["post-177703","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine) - IDEC INGENIERIE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m\u00b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine) - IDEC INGENIERIE\" \/>\n<meta property=\"og:description\" content=\"IDEC invited its client, French supermarket giant, INTERMARCHE, local councillors and partners, who have been working on the site, as well as their own staff to a traditional French leg&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m\u00b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC INGENIERIE\" \/>\n<meta property=\"article:published_time\" content=\"2017-11-09T16:23:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-22T01:53:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"J-Michel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"J-Michel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/\"},\"author\":{\"name\":\"J-Michel\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067\"},\"headline\":\"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine)\",\"datePublished\":\"2017-11-09T16:23:55+00:00\",\"dateModified\":\"2022-08-22T01:53:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/\"},\"wordCount\":409,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/\",\"url\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/\",\"name\":\"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine) - IDEC INGENIERIE\",\"isPartOf\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg\",\"datePublished\":\"2017-11-09T16:23:55+00:00\",\"dateModified\":\"2022-08-22T01:53:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage\",\"url\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg\",\"contentUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg\",\"width\":1280,\"height\":960},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/idec-ingenierie.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/idec-ingenierie.com\/#website\",\"url\":\"https:\/\/idec-ingenierie.com\/\",\"name\":\"IDEC INGENIERIE\",\"description\":\"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire\",\"publisher\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/idec-ingenierie.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\",\"name\":\"IDEC ING\u00c9NIERiE\",\"url\":\"https:\/\/idec-ingenierie.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png\",\"contentUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC ING\u00c9NIERiE\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/10409406\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067\",\"name\":\"J-Michel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"caption\":\"J-Michel\"},\"sameAs\":[\"https:\/\/idec-grandsud.com\/idec-sante\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine) - IDEC INGENIERIE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m\u00b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/","og_locale":"en_US","og_type":"article","og_title":"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine) - IDEC INGENIERIE","og_description":"IDEC invited its client, French supermarket giant, INTERMARCHE, local councillors and partners, who have been working on the site, as well as their own staff to a traditional French leg&hellip;","og_url":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m\u00b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/","og_site_name":"IDEC INGENIERIE","article_published_time":"2017-11-09T16:23:55+00:00","article_modified_time":"2022-08-22T01:53:24+00:00","og_image":[{"width":1280,"height":960,"url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg","type":"image\/jpeg"}],"author":"J-Michel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"J-Michel","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#article","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/"},"author":{"name":"J-Michel","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067"},"headline":"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine)","datePublished":"2017-11-09T16:23:55+00:00","dateModified":"2022-08-22T01:53:24+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/"},"wordCount":409,"commentCount":0,"publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/","url":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/","name":"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine) - IDEC INGENIERIE","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg","datePublished":"2017-11-09T16:23:55+00:00","dateModified":"2022-08-22T01:53:24+00:00","breadcrumb":{"@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#primaryimage","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-idec-gigot-bitume-intermarche-grand-fougeray-1280x960-1.jpg","width":1280,"height":960},{"@type":"BreadcrumbList","@id":"https:\/\/idec-ingenierie.com\/en\/idec-brings-together-160-people-for-a-leg-of-lamb-cooked-in-a-bath-of-asphalt-to-mark-the-completion-of-work-at-the-53000-m%c2%b2-warehouse-for-intermarche-in-grand-fougeray-ille-et-vilaine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-ingenierie.com\/en\/"},{"@type":"ListItem","position":2,"name":"IDEC brings together 160 people for a leg of lamb cooked in a bath of asphalt to mark the completion of work at the 53,000 m\u00b2 warehouse for Intermarche in Grand Fougeray (Ille-et-Vilaine)"}]},{"@type":"WebSite","@id":"https:\/\/idec-ingenierie.com\/#website","url":"https:\/\/idec-ingenierie.com\/","name":"IDEC INGENIERIE","description":"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire","publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-ingenierie.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-ingenierie.com\/#organization","name":"IDEC ING\u00c9NIERiE","url":"https:\/\/idec-ingenierie.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","width":130,"height":155,"caption":"IDEC ING\u00c9NIERiE"},"image":{"@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/10409406\/"]},{"@type":"Person","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067","name":"J-Michel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","caption":"J-Michel"},"sameAs":["https:\/\/idec-grandsud.com\/idec-sante\/"]}]}},"_links":{"self":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/177703","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/comments?post=177703"}],"version-history":[{"count":1,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/177703\/revisions"}],"predecessor-version":[{"id":179087,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/177703\/revisions\/179087"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media\/177301"}],"wp:attachment":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media?parent=177703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/categories?post=177703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/tags?post=177703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}