{"id":177791,"date":"2019-11-05T12:34:13","date_gmt":"2019-11-05T11:34:13","guid":{"rendered":"https:\/\/idec-grandsud.com\/idec-ingenierie\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/"},"modified":"2022-08-21T23:37:26","modified_gmt":"2022-08-21T21:37:26","slug":"the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise","status":"publish","type":"post","link":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/","title":{"rendered":"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE)"},"content":{"rendered":"<h2><strong>IDEC and STOKOMANI brought their teams together with various elected representatives on Friday 25<sup>th<\/sup> October when the first stone was laid and the first pillar put in place for a new warehouse currently being built in Venette (Oise) backed by the investor, AXA IM \u2013 Real Assets. This symbolic event brought all the stakeholders together to share some time with each other, as this 72,000 m\u00b2 project, the construction of which was awarded to IDEC, gets underway. <\/strong><\/h2>\n\n\n<h3 class=\"wp-block-heading\">All of the stakeholders got together<\/h3>\n\n\n<p>The builder, developer, future occupant and elected representatives got together on Friday 25<sup>th<\/sup> October for the laying of the first stone for a 72,000 m\u00b2 logistics project being built in Venette. All of the guests were able to watch this symbolic event marking the next stage in the construction project after the preparation of the ground and the laying of the foundations. The day continued with a tour of the building site on which work started this summer.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A warehouse with six units<\/h3>\n\n\n\n<p>This project for which IDEC was awarded the construction will house STOKOMANI, a company specialising in clearance sales for brand names will complement the three other warehouses already set up in the Oise department. It will allow the firm to manage the logistics activity for around a hundred stores across the country. To achieve this, STOKOMANI will have six units, five measuring 12,000 m\u00b2, and one measuring 9500 m\u00b2. Two of them will have narrow aisles with a wire-guided system.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">To be completed in August 2020<\/h3>\n\n\n<p>The keys for this project which aims to have BREEAM Good Level certification are due to be handed over at the end of August 2020. Some parts will be made available earlier in June. The IDEC teams will complete two units every fortnight to allow STOKOMANI to move in to install the racks.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Trust IDEC with your property projects<\/h3>\n\n\n<p>Like STOKOMANI, you too can rely on IDEC to design, build and take care of the maintenance of your property projects: logistics, service sector and industrial premises. Its teams of designers and builders will work with you throughout every stage of your project with a turnkey solution guaranteeing a commitment to deadlines, price and quality. From extensions measuring a few hundred square metres to the construction of new projects measuring between 5000 and 200,000 m\u00b2, IDEC is there to satisfy all your requirements.<\/p>","protected":false},"excerpt":{"rendered":"<p>IDEC and STOKOMANI brought their teams together with various elected representatives on Friday 25th October when the first stone was laid and the first pillar put in place for a&hellip;<\/p>\n","protected":false},"author":1,"featured_media":177526,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[55],"tags":[],"class_list":["post-177791","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE) - IDEC INGENIERIE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE) - IDEC INGENIERIE\" \/>\n<meta property=\"og:description\" content=\"IDEC and STOKOMANI brought their teams together with various elected representatives on Friday 25th October when the first stone was laid and the first pillar put in place for a&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC INGENIERIE\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-05T11:34:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-21T21:37:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"J-Michel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"J-Michel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/\"},\"author\":{\"name\":\"J-Michel\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067\"},\"headline\":\"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE)\",\"datePublished\":\"2019-11-05T11:34:13+00:00\",\"dateModified\":\"2022-08-21T21:37:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/\"},\"wordCount\":397,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/\",\"url\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/\",\"name\":\"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE) - IDEC INGENIERIE\",\"isPartOf\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg\",\"datePublished\":\"2019-11-05T11:34:13+00:00\",\"dateModified\":\"2022-08-21T21:37:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage\",\"url\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg\",\"contentUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg\",\"width\":1600,\"height\":1200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/idec-ingenierie.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/idec-ingenierie.com\/#website\",\"url\":\"https:\/\/idec-ingenierie.com\/\",\"name\":\"IDEC INGENIERIE\",\"description\":\"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire\",\"publisher\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/idec-ingenierie.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\",\"name\":\"IDEC ING\u00c9NIERiE\",\"url\":\"https:\/\/idec-ingenierie.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png\",\"contentUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC ING\u00c9NIERiE\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/10409406\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067\",\"name\":\"J-Michel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"caption\":\"J-Michel\"},\"sameAs\":[\"https:\/\/idec-grandsud.com\/idec-sante\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE) - IDEC INGENIERIE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/","og_locale":"en_US","og_type":"article","og_title":"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE) - IDEC INGENIERIE","og_description":"IDEC and STOKOMANI brought their teams together with various elected representatives on Friday 25th October when the first stone was laid and the first pillar put in place for a&hellip;","og_url":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/","og_site_name":"IDEC INGENIERIE","article_published_time":"2019-11-05T11:34:13+00:00","article_modified_time":"2022-08-21T21:37:26+00:00","og_image":[{"width":1600,"height":1200,"url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg","type":"image\/jpeg"}],"author":"J-Michel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"J-Michel","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#article","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/"},"author":{"name":"J-Michel","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067"},"headline":"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE)","datePublished":"2019-11-05T11:34:13+00:00","dateModified":"2022-08-21T21:37:26+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/"},"wordCount":397,"commentCount":0,"publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/","url":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/","name":"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE) - IDEC INGENIERIE","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg","datePublished":"2019-11-05T11:34:13+00:00","dateModified":"2022-08-21T21:37:26+00:00","breadcrumb":{"@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#primaryimage","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/photo-col-1ere-pierre-stokomani_v1_0.jpg","width":1600,"height":1200},{"@type":"BreadcrumbList","@id":"https:\/\/idec-ingenierie.com\/en\/the-first-pillar-set-up-for-the-stokomani-project-in-venette-oise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-ingenierie.com\/en\/"},{"@type":"ListItem","position":2,"name":"THE FIRST PILLAR SET UP FOR THE STOKOMANI PROJECT IN VENETTE (OISE)"}]},{"@type":"WebSite","@id":"https:\/\/idec-ingenierie.com\/#website","url":"https:\/\/idec-ingenierie.com\/","name":"IDEC INGENIERIE","description":"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire","publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-ingenierie.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-ingenierie.com\/#organization","name":"IDEC ING\u00c9NIERiE","url":"https:\/\/idec-ingenierie.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","width":130,"height":155,"caption":"IDEC ING\u00c9NIERiE"},"image":{"@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/10409406\/"]},{"@type":"Person","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067","name":"J-Michel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","caption":"J-Michel"},"sameAs":["https:\/\/idec-grandsud.com\/idec-sante\/"]}]}},"_links":{"self":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/177791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/comments?post=177791"}],"version-history":[{"count":2,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/177791\/revisions"}],"predecessor-version":[{"id":178643,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/177791\/revisions\/178643"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media\/177526"}],"wp:attachment":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media?parent=177791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/categories?post=177791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/tags?post=177791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}