{"id":180410,"date":"2022-03-04T13:46:33","date_gmt":"2022-03-04T12:46:33","guid":{"rendered":"https:\/\/idec-ingenierie.com\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/"},"modified":"2023-11-08T10:37:18","modified_gmt":"2023-11-08T09:37:18","slug":"argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment","status":"publish","type":"post","link":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/","title":{"rendered":"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><strong>The IDEC teams are working with ARGAN on the construction of an 18,000 m\u00b2 logistics platform in Saint-Andr\u00e9-sur-Orne (14), developed for LEGALLAIS.Sylvain, Works Supervisor at IDEC, is in charge of this project, and tells us about his day-to-day tasks on the worksite to ensure that the work is carried out properly. He also explains how the project is organized, and how the work is progressing.<\/strong><\/strong><\/h2>\n\n\n\n<p>Sylvain joined IDEC as Works Supervisor in September 2019, after a successful internship from April to August 2019.\u00a0\u201c<em>My main role is to monitor the progress of the work with the various contractors and to coordinate the work between the different parties involved\u201d<\/em> explains Sylvain.\u00a0\u201c<em>First of all, I focus on checking the design work carried out by each company during the execution phase, and making sure that the plans and products used comply with the client\u2019s specifications.Once the worksite has started, I focus on monitoring the schedule and managing the tasks of each contracting company, and I am responsible for the safety of all the workers on the site<\/em>.\u00a0\u201d<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A PROJECT DEVELOPED BY ARGAN FOR LEGALLAIS<\/h3>\n\n\n\n<p>ARGAN, specialist in the development and letting of logistics real estate, chose IDEC for the construction of a new logistics building.\u00a0This building is intended for LEGALLAIS, a professional hardware retailer and distributor of solutions for building professionals in 8 different business sectors.\u00a0\u201c<em>This building is located on an industrial park where LEGALLAIS already has a storage building.To expand its business, it is the tenant of the future ARGAN building on the plot next to its current building<\/em>\u201d adds Sylvain.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A NEW 18,000 M\u00b2 PROJECT<\/h3>\n\n\n\n<p>\u201c<em>The entire project spans 18,000 m\u00b2, with two dry cells of 9,000 m\u00b2 and 7,000 m\u00b2 for rack storage, with offices adjoining these cells.One of the special features is a small 350 m\u00b2 cell annexed to the building, which is intended for hazardous and flammable products.It requires more technology in terms of fire protection with a special sprinkler.<\/em>\u00a0\u201d points out Sylvain.\u00a0The entire project is aiming for BREEAM Very Good certification, and the roof is designed to accommodate solar panels.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u201cWE HAVE COMPLETED THE STRUCTURAL WORK ON THE PROJECT, AND WILL SOON BE STARTING WORK ON THE BUILDING ENVELOPE\u201d<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-1024x576.jpg\" alt=\"\" class=\"wp-image-177803\" srcset=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-1024x576.jpg 1024w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-300x169.jpg 300w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-768x432.jpg 768w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-1536x864.jpg 1536w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-370x208.jpg 370w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-1290x725.jpg 1290w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-840x473.jpg 840w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-410x231.jpg 410w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1-270x152.jpg 270w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/03\/PHOTO-COL-ARGAN-SAINT-ANDRE-14-02_web-1.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>After work began on November 2, the building\u2019s concrete framework is now complete, marking the end of work on the structural part of the cells.\u00a0\u201c<em>We are now going to begin work on the building envelope, which will last until mid-April, starting with the roof of the building and the steel structure for the offices, followed by the cladding, and then we will start casting the floor slabs inside the building<\/em>\u201d explains Sylvain.\u00a0Final delivery of the project is slated for late summer 2022, with the roof to be provided beforehand to install the solar panels.\u00a0A second handover is scheduled for the cells one month before final delivery, so that the client can install the racks.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The IDEC teams are working with ARGAN on the construction of an 18,000 m\u00b2 logistics platform in Saint-Andr\u00e9-sur-Orne (14), developed for LEGALLAIS.Sylvain, Works Supervisor at IDEC, is in charge of&hellip;<\/p>\n","protected":false},"author":1,"featured_media":177670,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[55],"tags":[],"class_list":["post-180410","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building - IDEC INGENIERIE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building - IDEC INGENIERIE\" \/>\n<meta property=\"og:description\" content=\"The IDEC teams are working with ARGAN on the construction of an 18,000 m\u00b2 logistics platform in Saint-Andr\u00e9-sur-Orne (14), developed for LEGALLAIS.Sylvain, Works Supervisor at IDEC, is in charge of&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC INGENIERIE\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-04T12:46:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-08T09:37:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"J-Michel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"J-Michel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/\"},\"author\":{\"name\":\"J-Michel\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067\"},\"headline\":\"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building\",\"datePublished\":\"2022-03-04T12:46:33+00:00\",\"dateModified\":\"2023-11-08T09:37:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/\"},\"wordCount\":491,\"publisher\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/\",\"url\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/\",\"name\":\"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building - IDEC INGENIERIE\",\"isPartOf\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg\",\"datePublished\":\"2022-03-04T12:46:33+00:00\",\"dateModified\":\"2023-11-08T09:37:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage\",\"url\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg\",\"contentUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/idec-ingenierie.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/idec-ingenierie.com\/#website\",\"url\":\"https:\/\/idec-ingenierie.com\/\",\"name\":\"IDEC INGENIERIE\",\"description\":\"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire\",\"publisher\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/idec-ingenierie.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/idec-ingenierie.com\/#organization\",\"name\":\"IDEC ING\u00c9NIERiE\",\"url\":\"https:\/\/idec-ingenierie.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png\",\"contentUrl\":\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC ING\u00c9NIERiE\"},\"image\":{\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/10409406\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067\",\"name\":\"J-Michel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"caption\":\"J-Michel\"},\"sameAs\":[\"https:\/\/idec-grandsud.com\/idec-sante\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building - IDEC INGENIERIE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/","og_locale":"en_US","og_type":"article","og_title":"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building - IDEC INGENIERIE","og_description":"The IDEC teams are working with ARGAN on the construction of an 18,000 m\u00b2 logistics platform in Saint-Andr\u00e9-sur-Orne (14), developed for LEGALLAIS.Sylvain, Works Supervisor at IDEC, is in charge of&hellip;","og_url":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/","og_site_name":"IDEC INGENIERIE","article_published_time":"2022-03-04T12:46:33+00:00","article_modified_time":"2023-11-08T09:37:18+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg","type":"image\/jpeg"}],"author":"J-Michel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"J-Michel","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#article","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/"},"author":{"name":"J-Michel","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067"},"headline":"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building","datePublished":"2022-03-04T12:46:33+00:00","dateModified":"2023-11-08T09:37:18+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/"},"wordCount":491,"publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/","url":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/","name":"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building - IDEC INGENIERIE","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg","datePublished":"2022-03-04T12:46:33+00:00","dateModified":"2023-11-08T09:37:18+00:00","breadcrumb":{"@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#primaryimage","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/07\/PHOTO-COL-IDEC-ARGAN-SAINT-ANDRE-14-01_web.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/idec-ingenierie.com\/en\/argan-a-saint-andre-sur-orne-14-fin-de-la-structure-du-batiment\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-ingenierie.com\/en\/"},{"@type":"ListItem","position":2,"name":"ARGAN in Saint-Andr\u00e9-sur-Orne (14): completion of the structural work on the building"}]},{"@type":"WebSite","@id":"https:\/\/idec-ingenierie.com\/#website","url":"https:\/\/idec-ingenierie.com\/","name":"IDEC INGENIERIE","description":"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire","publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-ingenierie.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-ingenierie.com\/#organization","name":"IDEC ING\u00c9NIERiE","url":"https:\/\/idec-ingenierie.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","width":130,"height":155,"caption":"IDEC ING\u00c9NIERiE"},"image":{"@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/10409406\/"]},{"@type":"Person","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/5a813b12b606b90093864eabddaf1067","name":"J-Michel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","caption":"J-Michel"},"sameAs":["https:\/\/idec-grandsud.com\/idec-sante\/"]}]}},"_links":{"self":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/180410","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/comments?post=180410"}],"version-history":[{"count":1,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/180410\/revisions"}],"predecessor-version":[{"id":180412,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/180410\/revisions\/180412"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media\/177670"}],"wp:attachment":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media?parent=180410"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/categories?post=180410"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/tags?post=180410"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}