{"id":181550,"date":"2026-06-19T14:50:00","date_gmt":"2026-06-19T12:50:00","guid":{"rendered":"https:\/\/idec-ingenierie.com\/?p=181550"},"modified":"2026-06-19T14:50:01","modified_gmt":"2026-06-19T12:50:01","slug":"final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france","status":"publish","type":"post","link":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/","title":{"rendered":"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France)"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong><strong>Construction of PLG\u2019s new distribution centre in Migni\u00e8res, in the Eure-et-Loir department of France, is entering its final phase. Developed by FAUBOURG PROMOTION and delivered by IDEC, this 25,000 sq m project reflects a shared commitment to high-performance and sustainable logistics solutions designed to support the client\u2019s long-term growth strategy.<\/strong><\/strong><\/h2>\n\n\n\n<div style=\"height:32px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">A NEW DISTRIBUTION CENTRE FOR PLG (BUNZL GROUP)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">PLG, a leading distributor of hygiene and cleaning products, is part of the BUNZL Group, the world\u2019s leading distribution and services company. The Migni\u00e8res project forms part of the group\u2019s strategy to modernise and expand its logistics capabilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Designed to optimise operational flows and improve supply chain efficiency, this future distribution centre will support PLG\u2019s ambitions in terms of both operational performance and sustainable development.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A 25,000 SQ M PROJECT SUPPORTING THE ENERGY TRANSITION<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The development covers a total floor area of 25,000 sq m, including modern warehouse facilities and office accommodation dedicated to administrative and support functions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project is targeting <strong>BREEAM Very Good certification<\/strong> and the <strong>BiodiverCity label<\/strong>, reflecting its low environmental impact and strong commitment to biodiversity integration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A rooftop photovoltaic power plant will also be installed, generating approximately <strong>1,436 MWh of renewable electricity per year<\/strong>, equivalent to the annual electricity consumption of <strong>666 households<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">ENTERING THE FINAL STAGES OF CONSTRUCTION<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Construction commenced in March 2024 and is progressing according to schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A first 6,000 sq m warehouse unit has already been handed over, enabling the operator to begin the installation of storage racking systems. Two additional units will be made available in the coming weeks, with final project completion scheduled for February 2025.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From the earliest design stages, the development was conceived with future growth in mind and includes the possibility of a <strong>12,000 sq m extension<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"180974\" src=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-1024x576.jpg\" alt=\"Centre de distribution PLG\" class=\"wp-image-180974\" srcset=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-1024x576.jpg 1024w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-300x169.jpg 300w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-768x432.jpg 768w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-1536x864.jpg 1536w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-2048x1152.jpg 2048w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-370x208.jpg 370w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-1290x725.jpg 1290w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-840x473.jpg 840w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-410x231.jpg 410w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094416_870_1732869906915_photo_optimized-270x152.jpg 270w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"596\" data-id=\"180976\" src=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-1024x596.jpg\" alt=\"Centre de distribution PLG\" class=\"wp-image-180976\" srcset=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-1024x596.jpg 1024w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-300x175.jpg 300w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-768x447.jpg 768w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-1536x894.jpg 1536w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-2048x1192.jpg 2048w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-370x215.jpg 370w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-840x489.jpg 840w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/IMG_1991-410x239.jpg 410w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">A PROJECT SHOWCASING THE GROUPE IDEC\u2019S INTEGRATED EXPERTISE<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This new distribution centre demonstrates the GROUPE IDEC\u2019s ability to bring together complementary areas of expertise to deliver a fully integrated solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">FAUBOURG PROMOTION led the development and design phases, IDEC is managing the turnkey construction of the facility, and the Group\u2019s renewable energy specialists are overseeing the installation of the photovoltaic power plant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This collaborative approach highlights the strength of the GROUPE IDEC model, delivering a project that combines operational performance, sustainability and long-term value creation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction of PLG\u2019s new distribution centre in Migni\u00e8res, in the Eure-et-Loir department of France, is entering its final phase. Developed by FAUBOURG PROMOTION and delivered by IDEC, this 25,000 sq&hellip;<\/p>\n","protected":false},"author":4,"featured_media":180973,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[55,64],"tags":[],"class_list":["post-181550","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-flux-grid-info-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France) - IDEC INGENIERIE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France) - IDEC INGENIERIE\" \/>\n<meta property=\"og:description\" content=\"Construction of PLG\u2019s new distribution centre in Migni\u00e8res, in the Eure-et-Loir department of France, is entering its final phase. Developed by FAUBOURG PROMOTION and delivered by IDEC, this 25,000 sq&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC INGENIERIE\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-19T12:50:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T12:50:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Blandine\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Blandine\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/\"},\"author\":{\"name\":\"Blandine\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\"},\"headline\":\"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France)\",\"datePublished\":\"2026-06-19T12:50:00+00:00\",\"dateModified\":\"2026-06-19T12:50:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/\"},\"wordCount\":392,\"publisher\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg\",\"articleSection\":[\"News\",\"News flux GRID INFO EN\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/\",\"name\":\"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France) - IDEC INGENIERIE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg\",\"datePublished\":\"2026-06-19T12:50:00+00:00\",\"dateModified\":\"2026-06-19T12:50:01+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/#primaryimage\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"DCIM101MEDIADJI_0869.JPG\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#website\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/\",\"name\":\"IDEC INGENIERIE\",\"description\":\"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire\",\"publisher\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/idec-ingenierie.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\",\"name\":\"IDEC ING\u00c9NIERiE\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/06\\\/logo-idec-130x155-fd-blc.png\",\"contentUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/06\\\/logo-idec-130x155-fd-blc.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC ING\u00c9NIERiE\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/10409406\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\",\"name\":\"Blandine\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"caption\":\"Blandine\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France) - IDEC INGENIERIE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/","og_locale":"en_US","og_type":"article","og_title":"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France) - IDEC INGENIERIE","og_description":"Construction of PLG\u2019s new distribution centre in Migni\u00e8res, in the Eure-et-Loir department of France, is entering its final phase. Developed by FAUBOURG PROMOTION and delivered by IDEC, this 25,000 sq&hellip;","og_url":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/","og_site_name":"IDEC INGENIERIE","article_published_time":"2026-06-19T12:50:00+00:00","article_modified_time":"2026-06-19T12:50:01+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg","type":"image\/jpeg"}],"author":"Blandine","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Blandine","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/#article","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/"},"author":{"name":"Blandine","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44"},"headline":"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France)","datePublished":"2026-06-19T12:50:00+00:00","dateModified":"2026-06-19T12:50:01+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/"},"wordCount":392,"publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg","articleSection":["News","News flux GRID INFO EN"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/","url":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/","name":"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France) - IDEC INGENIERIE","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/#primaryimage"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg","datePublished":"2026-06-19T12:50:00+00:00","dateModified":"2026-06-19T12:50:01+00:00","breadcrumb":{"@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/#primaryimage","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/01\/dji_fly_20241129_094350_869_1732869861501_photo_optimized-scaled.jpg","width":2560,"height":1440,"caption":"DCIM101MEDIADJI_0869.JPG"},{"@type":"BreadcrumbList","@id":"https:\/\/idec-ingenierie.com\/en\/final-construction-phase-underway-for-plgs-bunzl-group-new-distribution-centre-in-mignieres-eure-et-loir-france\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-ingenierie.com\/en\/"},{"@type":"ListItem","position":2,"name":"Final Construction Phase Underway for PLG\u2019s (BUNZL Group) New Distribution Centre in Migni\u00e8res (Eure-et-Loir, France)"}]},{"@type":"WebSite","@id":"https:\/\/idec-ingenierie.com\/#website","url":"https:\/\/idec-ingenierie.com\/","name":"IDEC INGENIERIE","description":"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire","publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-ingenierie.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-ingenierie.com\/#organization","name":"IDEC ING\u00c9NIERiE","url":"https:\/\/idec-ingenierie.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","width":130,"height":155,"caption":"IDEC ING\u00c9NIERiE"},"image":{"@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/10409406\/"]},{"@type":"Person","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44","name":"Blandine","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","caption":"Blandine"}}]}},"_links":{"self":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181550","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/comments?post=181550"}],"version-history":[{"count":1,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181550\/revisions"}],"predecessor-version":[{"id":181551,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181550\/revisions\/181551"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media\/180973"}],"wp:attachment":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media?parent=181550"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/categories?post=181550"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/tags?post=181550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}