{"id":181583,"date":"2025-06-25T15:29:00","date_gmt":"2025-06-25T13:29:00","guid":{"rendered":"https:\/\/idec-ingenierie.com\/?p=181583"},"modified":"2026-06-22T15:52:05","modified_gmt":"2026-06-22T13:52:05","slug":"new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95","status":"publish","type":"post","link":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/","title":{"rendered":"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95)"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong><strong>The construction site of the future industrial facility for HFR and FMP, located in Fr\u00e9pillon (Val-d\u2019Oise), has entered a new phase with the completion of the concrete floor slabs and the installation of 10 overhead cranes. Led by IDEC, this strategic project marks an important step in the development and merger of these two specialists in boring, honing and industrial turning operations. Delivery is scheduled for the end of the year.<\/strong><\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">A 7,000 sq m industrial facility for a key player in boring and honing operations<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This new 7,000 sq m facility will bring together all of HFR\u2019s and FMP\u2019s activities within a single modern and functional site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It will include a 6,000 sq m semi-underground workshop, 1,000 sq m of office space and a 90-space parking area.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This consolidation will optimise the Group\u2019s industrial performance while strengthening internal synergies.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A project focused on sustainability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Designed with strong environmental ambitions, the facility will incorporate a <strong>499 kWp photovoltaic power plant<\/strong> designed and installed by <strong>GROUPE IDEC ENR Solar<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The installation will generate approximately <strong>503 MWh per year<\/strong>, representing a reduction of around <strong>160 tonnes of CO\u2082 emissions over a 20-year period<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This choice illustrates the commitment of HFR and its partners to supporting the energy transition.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Works in progress: structure completed, fit-out works to come<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">With the installation of the overhead cranes (ranging from 3.2 to 10 tonnes) and the ongoing concrete slab works, the building is now watertight and weatherproof.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Interior works will begin in the coming weeks in order to maintain the project schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The completion of this facility represents a key milestone for HFR, demonstrating its commitment to modernising its industrial facilities while actively contributing to a more sustainable industrial sector.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Scheduled for delivery at the end of the year, the project will mark the completion of a major development combining industrial performance with environmental commitment.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"499\" data-id=\"181205\" src=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3-1024x499.jpg\" alt=\"\" class=\"wp-image-181205\" srcset=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3-1024x499.jpg 1024w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3-300x146.jpg 300w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3-768x374.jpg 768w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3-370x180.jpg 370w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3-840x409.jpg 840w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3-410x200.jpg 410w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image3.jpg 1119w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"421\" data-id=\"181203\" src=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2-1024x421.jpg\" alt=\"\" class=\"wp-image-181203\" srcset=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2-1024x421.jpg 1024w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2-300x123.jpg 300w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2-768x316.jpg 768w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2-370x152.jpg 370w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2-840x346.jpg 840w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2-410x169.jpg 410w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/Image2.jpg 1113w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction site of the future industrial facility for HFR and FMP, located in Fr\u00e9pillon (Val-d\u2019Oise), has entered a new phase with the completion of the concrete floor slabs and&hellip;<\/p>\n","protected":false},"author":4,"featured_media":181211,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[55,64],"tags":[],"class_list":["post-181583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-flux-grid-info-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95) - IDEC INGENIERIE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95) - IDEC INGENIERIE\" \/>\n<meta property=\"og:description\" content=\"The construction site of the future industrial facility for HFR and FMP, located in Fr\u00e9pillon (Val-d\u2019Oise), has entered a new phase with the completion of the concrete floor slabs and&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC INGENIERIE\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-25T13:29:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-22T13:52:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Blandine\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Blandine\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/\"},\"author\":{\"name\":\"Blandine\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\"},\"headline\":\"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95)\",\"datePublished\":\"2025-06-25T13:29:00+00:00\",\"dateModified\":\"2026-06-22T13:52:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/\"},\"wordCount\":326,\"publisher\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/06\\\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg\",\"articleSection\":[\"News\",\"News flux GRID INFO EN\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/\",\"name\":\"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95) - IDEC INGENIERIE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/06\\\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg\",\"datePublished\":\"2025-06-25T13:29:00+00:00\",\"dateModified\":\"2026-06-22T13:52:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/#primaryimage\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/06\\\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg\",\"contentUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/06\\\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#website\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/\",\"name\":\"IDEC INGENIERIE\",\"description\":\"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire\",\"publisher\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/idec-ingenierie.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\",\"name\":\"IDEC ING\u00c9NIERiE\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/06\\\/logo-idec-130x155-fd-blc.png\",\"contentUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/06\\\/logo-idec-130x155-fd-blc.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC ING\u00c9NIERiE\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/10409406\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\",\"name\":\"Blandine\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"caption\":\"Blandine\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95) - IDEC INGENIERIE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/","og_locale":"en_US","og_type":"article","og_title":"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95) - IDEC INGENIERIE","og_description":"The construction site of the future industrial facility for HFR and FMP, located in Fr\u00e9pillon (Val-d\u2019Oise), has entered a new phase with the completion of the concrete floor slabs and&hellip;","og_url":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/","og_site_name":"IDEC INGENIERIE","article_published_time":"2025-06-25T13:29:00+00:00","article_modified_time":"2026-06-22T13:52:05+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg","type":"image\/jpeg"}],"author":"Blandine","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Blandine","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/#article","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/"},"author":{"name":"Blandine","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44"},"headline":"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95)","datePublished":"2025-06-25T13:29:00+00:00","dateModified":"2026-06-22T13:52:05+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/"},"wordCount":326,"publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg","articleSection":["News","News flux GRID INFO EN"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/","url":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/","name":"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95) - IDEC INGENIERIE","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/#primaryimage"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg","datePublished":"2025-06-25T13:29:00+00:00","dateModified":"2026-06-22T13:52:05+00:00","breadcrumb":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/#primaryimage","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/06\/thumbnail_01idec_HFR_Frepillon_vue_aerienne.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-construction-site-of-the-future-industrial-facility-for-the-merger-of-hfr-and-fmp-in-frepillon-95\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-ingenierie.com\/en\/"},{"@type":"ListItem","position":2,"name":"New Milestone Reached on the Construction Site of the Future Industrial Facility for the Merger of HFR and FMP in Fr\u00e9pillon (95)"}]},{"@type":"WebSite","@id":"https:\/\/idec-ingenierie.com\/#website","url":"https:\/\/idec-ingenierie.com\/","name":"IDEC INGENIERIE","description":"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire","publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-ingenierie.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-ingenierie.com\/#organization","name":"IDEC ING\u00c9NIERiE","url":"https:\/\/idec-ingenierie.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","width":130,"height":155,"caption":"IDEC ING\u00c9NIERiE"},"image":{"@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/10409406\/"]},{"@type":"Person","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44","name":"Blandine","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","caption":"Blandine"}}]}},"_links":{"self":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/comments?post=181583"}],"version-history":[{"count":1,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181583\/revisions"}],"predecessor-version":[{"id":181584,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181583\/revisions\/181584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media\/181211"}],"wp:attachment":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media?parent=181583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/categories?post=181583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/tags?post=181583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}