{"id":181618,"date":"2025-12-18T09:40:00","date_gmt":"2025-12-18T08:40:00","guid":{"rendered":"https:\/\/idec-ingenierie.com\/?p=181618"},"modified":"2026-06-25T09:43:26","modified_gmt":"2026-06-25T07:43:26","slug":"new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan","status":"publish","type":"post","link":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/","title":{"rendered":"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong><strong>In Briare (Loiret), IDEC is entering a new strategic phase alongside Alderan with the extension of an existing logistics site. Carried out on an occupied site, this project combines business continuity, technical expertise and the creation of modern logistics facilities, illustrating IDEC\u2019s expertise in managing complex construction projects.<\/strong><\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">A strategic project underway for Alderan and IDEC<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the extension of the logistics site owned by a fund managed by Alderan in Briare, construction works are progressing in line with the schedule established at the launch of the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Carried out by IDEC, the project consists of the construction of a <strong>9,200 sq m extension<\/strong>, directly connected to the existing building, while maintaining the site&#8217;s operations throughout the construction period.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This extension responds to the growing demand for modern and optimised logistics space while enhancing the value of the fund\u2019s real estate assets.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Progress on the structural frame and foundations<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The project has reached a key milestone with the start of the erection of the concrete structure for <strong>Warehouse Unit 3<\/strong>, a major structural phase that shapes the main framework of the building and marks significant progress in the construction schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, the teams have continued the foundation works for <strong>Warehouse Unit 4<\/strong>, preparing the ground and structural elements that will support the future concrete frame.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The simultaneous execution of these operations demonstrates the well-controlled pace of the project and the efficient technical management of the different structural work phases.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A well-managed project on an occupied site<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One of the main challenges of this extension is that it is being carried out on an occupied site, requiring construction works to be coordinated while maintaining the existing logistics operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This constraint requires specific measures relating to safety, site traffic management and internal logistics, while ensuring uninterrupted operations for the site&#8217;s users.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">ENTRUST IDEC WITH YOUR REAL ESTATE PROJECTS<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Like ALDERAN, rely on IDEC to design, build and maintain your logistics, commercial and industrial real estate projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Its teams of designers and builders support clients throughout every stage of their projects through turnkey solutions that guarantee commitments on deadlines, costs and quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From extensions of a few hundred square metres to the construction of new facilities ranging from 5,000 to 200,000 sq m, IDEC is able to meet all of your real estate development needs.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"600\" data-id=\"181377\" src=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/ALDERAN-IDEC-1.jpg\" alt=\"\" class=\"wp-image-181377\" srcset=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/ALDERAN-IDEC-1.jpg 800w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/ALDERAN-IDEC-1-300x225.jpg 300w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/ALDERAN-IDEC-1-768x576.jpg 768w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/ALDERAN-IDEC-1-370x278.jpg 370w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/ALDERAN-IDEC-1-410x308.jpg 410w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"181375\" src=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-1024x768.png\" alt=\"\" class=\"wp-image-181375\" srcset=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-1024x768.png 1024w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-300x225.png 300w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-768x576.png 768w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-1536x1152.png 1536w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-2048x1536.png 2048w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-370x278.png 370w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-840x630.png 840w, https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/shared-image-40-410x308.png 410w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Briare (Loiret), IDEC is entering a new strategic phase alongside Alderan with the extension of an existing logistics site. Carried out on an occupied site, this project combines business&hellip;<\/p>\n","protected":false},"author":4,"featured_media":181617,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[55,64],"tags":[],"class_list":["post-181618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-flux-grid-info-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan - IDEC INGENIERIE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan - IDEC INGENIERIE\" \/>\n<meta property=\"og:description\" content=\"In Briare (Loiret), IDEC is entering a new strategic phase alongside Alderan with the extension of an existing logistics site. Carried out on an occupied site, this project combines business&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC INGENIERIE\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-18T08:40:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-25T07:43:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/IDEC-e1766047258185.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"780\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Blandine\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Blandine\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/\"},\"author\":{\"name\":\"Blandine\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\"},\"headline\":\"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan\",\"datePublished\":\"2025-12-18T08:40:00+00:00\",\"dateModified\":\"2026-06-25T07:43:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/\"},\"wordCount\":401,\"publisher\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/IDEC-e1766047258185.png\",\"articleSection\":[\"News\",\"News flux GRID INFO EN\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/\",\"name\":\"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan - IDEC INGENIERIE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/IDEC-e1766047258185.png\",\"datePublished\":\"2025-12-18T08:40:00+00:00\",\"dateModified\":\"2026-06-25T07:43:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/IDEC-e1766047258185.png\",\"contentUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/IDEC-e1766047258185.png\",\"width\":2000,\"height\":780},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/idec-ingenierie.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#website\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/\",\"name\":\"IDEC INGENIERIE\",\"description\":\"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire\",\"publisher\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/idec-ingenierie.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#organization\",\"name\":\"IDEC ING\u00c9NIERiE\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/06\\\/logo-idec-130x155-fd-blc.png\",\"contentUrl\":\"https:\\\/\\\/idec-ingenierie.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/06\\\/logo-idec-130x155-fd-blc.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC ING\u00c9NIERiE\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/10409406\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/idec-ingenierie.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\",\"name\":\"Blandine\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"caption\":\"Blandine\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan - IDEC INGENIERIE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/","og_locale":"en_US","og_type":"article","og_title":"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan - IDEC INGENIERIE","og_description":"In Briare (Loiret), IDEC is entering a new strategic phase alongside Alderan with the extension of an existing logistics site. Carried out on an occupied site, this project combines business&hellip;","og_url":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/","og_site_name":"IDEC INGENIERIE","article_published_time":"2025-12-18T08:40:00+00:00","article_modified_time":"2026-06-25T07:43:26+00:00","og_image":[{"width":2000,"height":780,"url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/IDEC-e1766047258185.png","type":"image\/png"}],"author":"Blandine","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Blandine","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/#article","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/"},"author":{"name":"Blandine","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44"},"headline":"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan","datePublished":"2025-12-18T08:40:00+00:00","dateModified":"2026-06-25T07:43:26+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/"},"wordCount":401,"publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/IDEC-e1766047258185.png","articleSection":["News","News flux GRID INFO EN"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/","url":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/","name":"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan - IDEC INGENIERIE","isPartOf":{"@id":"https:\/\/idec-ingenierie.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/#primaryimage"},"image":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/IDEC-e1766047258185.png","datePublished":"2025-12-18T08:40:00+00:00","dateModified":"2026-06-25T07:43:26+00:00","breadcrumb":{"@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/#primaryimage","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/IDEC-e1766047258185.png","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2025\/12\/IDEC-e1766047258185.png","width":2000,"height":780},{"@type":"BreadcrumbList","@id":"https:\/\/idec-ingenierie.com\/en\/new-milestone-reached-on-the-logistics-project-in-briare-45-for-a-fund-managed-by-alderan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-ingenierie.com\/en\/"},{"@type":"ListItem","position":2,"name":"New Milestone Reached on the Logistics Project in Briare (45) for a Fund Managed by Alderan"}]},{"@type":"WebSite","@id":"https:\/\/idec-ingenierie.com\/#website","url":"https:\/\/idec-ingenierie.com\/","name":"IDEC INGENIERIE","description":"D\u00e9couvrez IDEC, le sp\u00e9cialiste de la conception et construction cl\u00e9 en main d\u2019immobilier logistique, industriel et tertiaire","publisher":{"@id":"https:\/\/idec-ingenierie.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-ingenierie.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-ingenierie.com\/#organization","name":"IDEC ING\u00c9NIERiE","url":"https:\/\/idec-ingenierie.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","contentUrl":"https:\/\/idec-ingenierie.com\/wp-content\/uploads\/sites\/3\/2022\/06\/logo-idec-130x155-fd-blc.png","width":130,"height":155,"caption":"IDEC ING\u00c9NIERiE"},"image":{"@id":"https:\/\/idec-ingenierie.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/10409406\/"]},{"@type":"Person","@id":"https:\/\/idec-ingenierie.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44","name":"Blandine","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","caption":"Blandine"}}]}},"_links":{"self":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/comments?post=181618"}],"version-history":[{"count":1,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181618\/revisions"}],"predecessor-version":[{"id":181621,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/posts\/181618\/revisions\/181621"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media\/181617"}],"wp:attachment":[{"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/media?parent=181618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/categories?post=181618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-ingenierie.com\/en\/wp-json\/wp\/v2\/tags?post=181618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}