Skip to content Skip to footer

POMONA in Sorigny (37): completion of the structural work on the building

IDEC is assisting POMONA in the construction of a 5,700 m² temperature-controlled warehouse in Sorigny (37). Romain, our senior project engineer, describes his main tasks on this project, and explains how the work is progressing.

Romain started out as a trainee at IDEC with a 5-month final year internship and was then hired as a Project Engineer for 5 years. In December 2019, he was promoted to Senior Project Engineer.

Do you have a project?

"*" indicates required fields

By validating this form, you agree for your data to be collected by Idec or any other subsidiary of Groupe Idec, for the purpose of processing your request and for commercial prospecting.

*The fields marked with an asterisk above are required in order for us to respond to your request.

If you do not wish to be contacted for marketing purposes, please click on the following link: unsubscribe. You have a right of access, opposition, portability, deletion, restriction and post-mortem control. You also have the possibility of registering free of charge on an opt-out list for direct marketing by phone. For more information on the processing of your data and your rights, please read our data protection policy.

Hidden
Hidden
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.
IDEC: The logistics specialist
As a turnkey designer-builder, IDEC guides and assists you in fulfilling your real-estate projects. Our teams work hand in hand with you to carry out your logistics, industrial and tertiary sector operations, while factoring in the levers of energy and decarbonization.
A GROUPE IDEC subsidiary

IDEC leverages its inclusion within GROUPE IDEC to provide a holistic approach.

Download our brochure
Haut de page