19 February 2018A LOOK AT HOW WORK IS GOING ON THE CONSTRUCTION OF A MULTI-TEMPERATURE WAREHOUSE FOR TRANSGOURMET IN SAINT LOUBES (GIRONDE)
8 February 2018IDEC HANDS OVER THE EXTENSION TO A CONTROLLED TEMPERATURE WAREHOUSE FOR SIMPLY MARKET IN SAINT OUEN L’AUMÔNE (VAL D’OISE)
29 January 2018IDEC HANDS OVER THE KEYS TO AN EXTENSION FOR GEODIS IN CESSON-SEVIGNE (ILLE-ET-VILAINE)
26 January 2018IDEC HANDS OVER THE KEYS TO AN EXTENSION TO FOUSSIER’S DRY WAREHOUSE IN ALLONNES (SARTHE)
15 January 2018FRANCE’S BIGGEST LOGISTICS WAREHOUSE BEING BUILT BY IDEC: HOW THINGS ARE PROGRESSING (PART 2)
13 December 2017A LOOK AT HOW WORK IS PROGRESSING ON THE LOGISTICS WAREHOUSE DEVELOPED BY FAUBOURG PROMOTION AND BUILT BY IDEC FOR XPO LOGISTICS IN FOS SUR MER (BOUCHES DU RHONE)
8 December 2017IDEC HAS ERECTED THE FIRST CONCRETE PILLARS FOR A NEW LOGISTICS WAREHOUSE FOR TRANSGOURMET IN SAINT-LOUBES (GIRONDE)
6 December 2017COME AND TALK TO THE IDEC GROUP AT THE SIMI FROM 6TH TO 8TH DECEMBER ON STANDS A01 & D82